Abraham, D M and Yeh, M H J (1999) Breakwater construction: an effective method for industrial waste utilization. Engineering, Construction and Architectural Management, 6(02), 145–54.

Al-Tabtabai, H and Alex, A P (1999) Using genetic algorithms to solve optimization problems in construction. Engineering, Construction and Architectural Management, 6(02), 121–32.

  • Type: Journal Article
  • Keywords: genetic algorithm; optimization
  • ISBN/ISSN: 0969-9988
  • URL: http://www.blackwell-synergy.com/links/doi/10.1046/j.1365-232x.1999.00086.x/abs
  • Abstract:
    Genetic algorithm (GA) is a model of machine learning. The algorithm can be used to find sub-optimum, if not optimum, solution(s) to a particular problem. It explores the solution space in an intelligent manner to evolve better solutions. The algorithm does not need any specific programming efforts but requires encoding the solution as strings of parameters. The field of application of genetic algorithms has increased dramatically in the last few years. A large variety of possible GA application tools now exist for non-computer specialists. Complicated problems in a specific optimization domain can be tackled effectively with a very modest knowledge of the theory behind genetic algorithms. This paper reviews the technique briefly and applies it to solve some of the optimization problems addressed in construction management literature. The lessons learned from the application of GA to these problems are discussed. The result of this review is an indication of how the GA can contribute in solving construction-related optimization problems. A summary of general guidelines to develop solutions using this optimization technique concludes the paper.

Alshawi, M and Hassan, Z (1999) Integrated models for construction planning: object flow and relationship. Engineering, Construction and Architectural Management, 6(02), 197–212.

Bhokha, S and Ogunlana, S O (1999) Application of artificial neural network to forecast construction duration of buildings at the pre-design stage. Engineering, Construction and Architectural Management, 6(02), 133–44.

Bowen, P A, Pearl, R G and Edwards, P J (1999) Client briefing processes and procurement method selection: a South African study. Engineering, Construction and Architectural Management, 6(02), 91–104.

Emmitt, S (1999) Architectural management: an evolving field. Engineering, Construction and Architectural Management, 6(02), 188–96.

Liu, A M-M (1999) A research model of project complexity and goal commitment effects on project outcome. Engineering, Construction and Architectural Management, 6(02), 105–11.

Ndekugri, I and McDonnell, B (1999) Differing site conditions risks: a FIDIC/engineering and construction contract comparison. Engineering, Construction and Architectural Management, 6(02), 177–87.

Ng, S T, Skitmore, M R and Smith, N J (1999) Decision-makers' perceptions in the formulation of pre-qualification criteria. Engineering, Construction and Architectural Management, 6(02), 155–65.

Walker, A and Wing, C K (1999) The relationship between construction project management theory and transaction cost economics. Engineering, Construction and Architectural Management, 6(02), 166–76.

Wantanakorn, D, Mawdesley, M J and Askew, W H (1999) Management errors in construction. Engineering, Construction and Architectural Management, 6(02), 112–20.